When we came in
A large cast-iron boiler occupied the basement’s heating area, with established pipework running around it. The original equipment and surrounding connections are shown in the first photographs.
A basement heating project, from the larger original boiler through removal to the replacement equipment and connections.
A large cast-iron boiler occupied the basement’s heating area, with established pipework running around it. The original equipment and surrounding connections are shown in the first photographs.
The sequence includes the old boiler being dismantled, followed by the replacement unit in position. The later views show copper connections, valves and two white plastic pipe runs above the equipment.
The replacement is photographed with its front cover removed, showing the components and connections normally hidden from view. These are installation-stage photographs, rather than a closed-up final presentation.
We’ll review your request and contact you if we can assist.